2449 Heated Sq Ft
583 Garage 2732 First floor sq ft
126 Porch
3158 Total Sq ft
Donated by: Quantity Cost Ext Cost
General Conditions
needed Permit allowance from formula each 1,380.00 1.00
needed Water Tap Fee-Dorchester County each 1 1,500.00
needed Clearing Stakes each 1 117.00
needed Stake House Corners each 1 190.00
needed Individiual Site Plan each 1 68.00
needed Elevation Certificate each 1 190.00
needed Utility Connection (Berkeley Co Water) each 1 350.00
needed Flat -Material each 700 1.13 791.00
needed Flatwork -Labor each 700 1.00 700.00
Concrete on Demand Monoslab Material (56 cubic yards) sqft 2,732.00 2.30 6,283.60
Concrete on Demand Monoslab Labor sqft 2,732.00 2.00 5,464.00
Concrete on Demand Rebar (27) #5 or (42) #3 in 20' lengths each
needed Backfill LS 3 300.00
needed Silt Fence each 1 300.00
needed Gravel For Driveways each 1 300.00
needed Window Lock DOCBOX each 1 32.78
needed 2x4x8 SYP Treated #2 Each 1 4.60
 
 
Framing Assembly
Schumacher Homes Framing Labor Two Story SF 3,158.00 2.80 8,842.40
HD Supply Lumber & Building Materials  Truss Package (Roof and second floor bonus room) each 1 0.00
needed 2x4x14 SPY Treated #2 Each 36 5.76 207.36
needed 2x6x14 SYP Treated #2 Each 2 6.42 12.84
needed 2x4x105 S-Dry SPF #2&BTR Each 472 2.58 1,217.76
needed 2x6x105 SPF Stud Each 12 4.01 48.12
needed 2x6x16 #2 SYP Each 2 5.88 11.76
needed 2x4x14 #2 SPY Each 248 2.76 684.48
needed 2x8x16 #2 SYP Each 30 8.67 260.10
needed 7/16x4x8 OSB Each 85 5.25 446.25
needed Pro-Subfloor Adhesive-tube Each 6 2.40 14.40
needed 2x4x93 S-Dry SPF Stud each 0 1.93 0.00
needed 2x6x93 S-Dry SPF Stud Each 0 3.28 0.00
needed OSB 3/4'' T&G each 18 10.64 191.52
needed Felt #15 4sq each 7 14.23 99.61
needed House Wrap each 13 117.60 1,528.80
needed 1-1/4'' Simplex Bucket Each 1 17.99 17.99
needed 3 1/2'' Sill Seal-50 ft. roll each 3 2.16 6.48
needed 1/2'' Ply clips-Box each 1 12.45 12.45
Simpson Strong Tie Simpson-CS18-200ft roll each 1 80.00 80.00
Simpson Strong Tie Simpson-H2.5A each 12 0.24 2.88
Simpson Strong Tie Simpson LTT19 each 28 6.65 186.20
needed 1.75x12x18 LVL each 2 75.55 151.10
needed 2x12x14 #2 SYP Each 5 11.99 59.95
needed 2x10x14 SYP #2 Each 3 10.95 32.85
needed Structural Beam for Garage opening (16' opening) each 1 0.00
needed Set Pac 22 each 3 24.50 73.50
needed 5/8x12'' Galv. All Thread each 56 1.50 84.00
needed 5/8 Galv Hex Nut-EA foot 56 0.20 11.20
needed 5/8'' Plain Cut Washer each 28 0.15 4.20
needed LBPS5/8Z each 56 0.90 50.40
needed 2x8x16 SYP Treated #2 Each 2 11.75 23.50
Simpson Strong Tie H-10 Simpson Fastner each 60 0.99 59.40
needed OSI SBR-100 each 9 3.00 27.00
needed 6''x75' EZ Flash each 4 16.83 67.32
needed LUS 28 reg each 4 0.65 2.60
needed HTS24 each 9 1.10 9.90
needed Tapered 12" Columns (6') each 4 0.00
needed 16x16 Pedastal each 4 0.00
3/1 SH Windows
Stock Building Supply 2852  SH 3 over 1 each 4
Stock Building Supply 2030 SH 3 over 1 each 1
Stock Building Supply 2860 SH 3 over 1 each 7
Stock Building Supply 2460 SH 3 over 1 each 3
Stock Building Supply CM 2444 SH 3 over 1 each 3
Stock Building Supply 3030 SH 3 over 1 each 2
Stock Building Supply 3010 Fixed Transom each 1
needed 1068 Side Front Door Transom each 2
needed 3068 Front Door w/ 3010 Transom each 1
needed 3068 French Clear  each 1
needed 3068 Solid door w/ dog door each 2
 
  Roofing Assembly
Certainteed & Americo Roofing Roofing Material sq 28
Americo Roofing Roofing Labor Base sq 28
needed Ridge Vent LF 62
Siding Assembly
James Hardie Siding Products Synthetic Lap Siding sq 21
James Hardie Siding Products Synthetic Shake Siding sq 5
G&S Supply Siding Labor (2) sq 21
G&S Supply Shake Labor sq 5
James Hardie Siding Products Soffit, Facia, Freeze foot 160
needed Frieze-Siding foot 36
needed Porch Ceiling sq 1.5
needed Outside Corners foot 110
needed Inside Corners foot 60
needed 16' GAR MNL w/KS each 1
needed Window Trim Single (2) each 5
needed Rectangle Vents-Siding each 6
needed Window Trim Double (2) each 5
needed Window Trim Triple each 2
needed 10'' Fypon Colum each 2
needed Wrap Porch Beam-Back each 16
needed Triangle Vent each 1
needed 36'' Window Mant each 1
needed Double window mantle each 1
needed Garage Matle each 1
 
  Interior Trim Assembly Base
needed 366 2-3/4 CASING FJ FT 154
needed 5 1/4 MDF STOOL each 4
needed WM623 MDF BASE x16' each 48
needed 3/0 6/8 RH 366FJ each 2
needed 3/0 6/8 LH 366FJ each 4
needed 2/0 6/8 Pocket each 6
needed 3/0 6/8 Pocket each 2
needed 4/0 6/8 Bifold each 2
needed 2/6 6/8 Bifold each 1
needed 21/4'' Fir Hand Rail 16' each 1
needed Handrail Bracket each 5
needed Newell post w/ Rosette  (4' tall) each 1
needed Traditional pickets each 8
needed Pocket Door Track 48'' each 8
Classic Remodeling & Atlantic Builders Trim Labor (estimated to per foot total) Each 1,950.00
needed Builder Shims each 1
needed 2X4X8TR2 each 1
needed 2X6X8TR2 each 1
needed 6/0 Cased Opening FJ 356 each 1
needed 1x8x16 MDF each 2
Labor & Materials- Builders Hardware of Charleston Interior Hardware
Builders Hardware of Charleston Front Handleset each 1
Builders Hardware of Charleston Exterior lock combo each 2
Builders Hardware of Charleston Privacy each 4
Builders Hardware of Charleston Passage each 2
builders hardware of charleston Bi-fold knobs each 5
Builders Hardware of Charleston Pocket Door Hardware set each 8
builders hardware of charleston Ball Catches each
builders hardware of charleston Door Stops each 8
builders hardware of charleston Four-4'' House Numbers each 1
Builders Hardware of Charleston (discount only) Mailbox w/ paperbox each 1
Labor & Materials- Builders Hardware of Charleston Bath Hardware
Builders Hardware of charleston Standard Towel Bar each 2
Builders Hardware of charleston Standard Towel Ring each 2
Builders Hardware of charleston Standard Paperholder each 2
Home Team Pest Control Termite Protection Each 1 85.00
needed Mirrors Each 2 275.00
needed Shelving: 1 walk in, 2 standard closets (need quote) Each
needed Mechanical/Plumbing
needed HVAC Rough 13 Seer (need quote) figure is estimate each 1 3,840.00
needed HVAC Trim (need quote) figure is estimate each 1 2,560.00
needed Plumb Slab estimate each 1 1,800.00
needed Plumb Rough estimate each 1 1,800.00
needed Plumb Trim estimate each 1 2,400.00
East Coast Flooring 30x60 Tub (Handicap-Accessible) each 1
needed 36x60 tub/shower combo each 1
needed Shower fixtures for stand up shower each 1
needed Tub/shower faucet kit each 1
needed Tub faucet kit each 1
needed Faucet for lavatory each 3
needed Elongated toilets each 2
needed Refrigerator water box kit each 1
needed Dbl bowl 8" stainless drop in sink each 1
needed Kitchen faucet (three hole) each 1
Electrical Package
needed Electric Rough estimate each 1.05 3,158.00 3,315.90
needed Electrical Trim estimate each 0.70 3,158.00 2,210.60
5,526.50
Premier Lighting Ceiling fan w/ light each 7.00
Premier Lighting Exterior ceiling fan w/ light each 1.00
Premier Lighting Standard overhead light each 9.00
Premier Lighting Wall mount sconce each 2.00
Premier Lighting Vanity light each 3.00
Premier Lighting Can light (kitchen) each 7.00
Premier Lighting Dual spot light (exterior) each 2.00
Premier Lighting Exterior wall light each 3.00
Premier Lighting Exhaust fan each 2.00
needed Smoke Detectors each 6.00
needed Heat lamp (see specifications) each 1.00
needed Receptacle per plan and/or code each 43.00
needed GFI Receptacle each 4.00
needed Dryer outlet each 1.00
needed Waterproof Receptacle each 2.00
needed Switch each 30.00
needed Insualtion estimate each 1 1,785.00
needed Drywall material estimate off sq feet sqft 11,116.00